Projects

BOUBYAN BANK REMODELING OF KHAIFAN BRANCH

Remodelling of Khaifan branch with approximately 360 m² area. Being the first branch to highlight it’s innovative interior look as digital and technological nature without compromising the modern outlook with a combination of fabric wrapped panels, wooden rib panelling on walls and ceilings, glass and digital glass cladding, and custom made furniture which emphasizes the bank’s identity.

Location

Client

Year Completed

:  Sabah Al Salem

:  Boubyan Bank

:  2019

BOUBYAN BANK REMODELING OF KHAIFAN BRANCH

Project Description

Remodelling of Khaifan branch with approximately 360 m² area. Being the first branch to highlight it’s innovative interior look as digital and technological nature without compromising the modern outlook with a combination of fabric wrapped panels, wooden rib panelling on walls and ceilings, glass and digital glass cladding, and custom made furniture which emphasizes the bank’s identity.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Sabah Al Salem

:  Boubyan Bank

:  2019

Scope of Work

• Demolition, Construction, completion, commissioning, handing–over and maintenance.

• Civil / Finishes (Interior / Exterior) Turnkey Interiors: Site and External Works, Concrete and Masonry, Metals, Glazing and Curtain Wall, Carpentry Works,  Painting, Carpentry/Wood Works, Installation of Doors, Signage.

• Mechanical Works: HVAC, Plumbing & Fire Fighting.

• Electrical Works:  Wiring (Open, Concealed, Trunkey), MSB, DBs, Lighting, Telephone Data, Generator & Fire Fighting.

KFH BANK – AL MANSHAR BRANCH

A fully revamped branch with approximately 275 m² single floor area emphasizing the bank’s contemporary design to meet the modern aspirations of customers and reflect the bank’s care for their comfort.

Location

Client

Year Completed

:  Al Manshar Complex, Fahaheel

:  Kuwait Finance House

:  2019

KFH BANK – AL MANSHAR BRANCH

Project Description

A fully revamped branch with approximately 275 m² single floor area emphasizing the bank’s contemporary design to meet the modern aspirations of customers and reflect the bank’s care for their comfort.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Al Manshar Complex, Fahaheel

:  Kuwait Finance House

:  2019

Scope of Work

• Demolition, Construction, Completion, commissioning, handing–over and maintenance.

• Turnkey Interiors: Concrete and Masonry, Metals, Doors, Glazing and Curtain Wall. Finishes such as Paint, Gypsum board partitions, glass partitions, ceilings, ceramic tiles, stone works and carpet, Carpentry/Wood Works and Signage.

• ELECTRO-MECHANICAL WORKS

KFH BANK – FARWANIYA BRANCH

A new standalone branch consisting of basement, ground, first and roof floor.

Location

Client

Year Completed

:  Farwaniya – Kuwait

:  Kuwait Finance House (KFH)

:  Ongoing

KFH BANK – FARWANIYA BRANCH

Project Description

A new standalone branch consisting of basement, ground, first and roof floor.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Farwaniya – Kuwait

:  Kuwait Finance House (KFH)

:  Ongoing

Scope of Work

• Construction, Completion, commissioning, handing–over and maintenance.

• Turnkey Interiors: Concrete and Masonry, Metals, Doors, Glazing and Curtain Wall. Finishes such as Paint, Gypsum board partitions, glass partitions, ceilings, ceramic tiles, stone works and carpet, Carpentry/Wood Works and Signage.

• ELECTRO-MECHANICAL WORKS.

NBK – Avenues Branch Phase IV

Project Description

A new branch with approximately 280 m² floor area reflects keenness to ensure customer’s convenience with its modern design state of the art technology, screens across the branch which implements comprehensive vision for developing the traditional concept of branches.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Avenues Mall-PH IV, Al Rai

:  National Bank of Kuwait

:  2020

NBK – Avenues Branch Phase IV

Project Description

A new branch with approximately 280 m² floor area reflects keenness to ensure customer’s convenience with its modern design state of the art technology, screens across the branch which implements comprehensive vision for developing the traditional concept of branches.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Avenues Mall-PH IV, Al Rai

:  National Bank of Kuwait

:  2020

Scope of Work

• Construction, completion, commissioning, handing–over and maintenance.

• Turnkey Interiors: Concrete and Masonry, Metals, Glazing and doors. Finishes such as Paint, Gypsum board partitions, glass partitions, ceilings, ceramic tiles, stone works, carpet, vinyl flooring and acoustic panels.

NBK – Farwaniya Branch

Project Description

A new standalone branch with two (2) levels, roof and a basement approximately 1570 m² floor area.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Farwaniya

:  National Bank of Kuwait

:  2019

NBK – Farwaniya Branch

Project Description

A new standalone branch with two (2) levels, roof and a basement approximately 1570 m² floor area.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Farwaniya

:  National Bank of Kuwait

:  2019

Scope of Work

• Construction, completion, commissioning, handing–over and maintenance.

• Site/External Works, Civil/Structural Works, Landscaping, Concrete and Masonry, Metals, Glazing and curtain walls, Aluminum Panels, doors. Finishes such as Paint, Gypsum board partitions, glass partitions, ceilings, ceramic tiles, stone works, carpet, and vinyl flooring.

NBK – Dasma Branch

Project Description

A new standalone branch consist of basement, ground, first and roof floor with approximately 1200 m² floor area.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Dasma

:  National Bank of Kuwait

:  2020

NBK – Dasma Branch

Project Description

A new standalone branch consist of basement, ground, first and roof floor with approximately 1200 m² floor area.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Dasma

:  National Bank of Kuwait

:  2020

Scope of Work

• Construction, completion, commissioning, handing–over and maintenance.

• Site/External Works, Civil/Structural Works, Landscaping, Concrete and Masonry, Metals, Glazing and curtain walls, Aluminum Panels, doors. Finishes such as Paint, Gypsum board partitions, glass partitions, ceilings, ceramic tiles, stone works, carpet, and vinyl flooring.

Warba Bank – Jaber AL Ahmad Branch

Project Description

A new standalone branch consisting of ground, first and roof floor.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Jaber AL Ahmad

:  Warba Bank Kuwait

:  2020

Warba Bank – Jaber AL Ahmad Branch

Project Description

A new standalone branch consisting of ground, first and roof floor.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Jaber AL Ahmad

:  Warba Bank Kuwait

:  2020

Scope of Work

• Construction, completion, commissioning, handing–over and maintenance.

• Site/External Works, Civil/Structural Works, Landscaping, Concrete and Masonry, Metals, Glazing and curtain walls, Aluminum Panels, doors. Finishes such as Paint, Gypsum board partitions, glass partitions, ceilings, ceramic tiles, stone works, carpet, and vinyl flooring.

Developing Sport Playgrounds Project at Al-Ahmadi City and Improving Japanese Garden

Project Description

Civil, Architectural and Finishing Works of Nine Buildings for Developing Sport Playgrounds Project at Al-Ahmadi City and Improving Japanese Garden.

Location

Client

Main Cont.

Year Completed

:  Ahmadi- Kuwait

:  Kuwait Oil Co. (KOC)

:  Turki-Al Dabbous & Sons Co.

:  2016

Developing Sport Playgrounds Project at Al-Ahmadi City and Improving Japanese Garden

Project Description

Civil, Architectural and Finishing Works of Nine Buildings for Developing Sport Playgrounds Project at Al-Ahmadi City and Improving Japanese Garden.

Location

Client

Main Cont.

Year Completed

:  Ahmadi- Kuwait

:  Kuwait Oil Co. (KOC)

:  Turki-Al Dabbous & Sons Co.

:  2016

Scope of Work

• Civil / Finishes (Interior / Exterior Works for Nine Buildings)

• Turnkey Interiors: Excavation, Concrete, Masonry, Metals & Carpentry Works, Painting, Metal Cladding & Landscape Works

• Installation of Doors, Elevators and Finishing Works etc.

PRIORITY CAR SHOWROOM

Project Description

Civil, Architectural and Finishing Works.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Shuwaikh – Kuwait City

:  Al Massar Leasing & Investment Co.

:  2010

PRIORITY CAR SHOWROOM

Project Description

Civil, Architectural and Finishing Works.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Shuwaikh – Kuwait City

:  Al Massar Leasing & Investment Co.

:  2010

Scope of Work

• Civil / Architectural Works – Turnkey Interiors Electro-Mechanical Works

Private Villa in Abu Al-Hassaniah Area

Project Description

Renovation of Private Villa

Designation

Location

Client

Year Completed

:  Main Contractor

:  Abu AL-Hassaniah

:  Mr. Ahmad Al-Hamad Residence

:  2012

Private Villa in Abu Al-Hassaniah Area

Project Description

Renovation of Private Villa

Designation

Location

Client

Year Completed

:  Main Contractor

:  Abu AL-Hassaniah

:  Mr. Ahmad Al-Hamad Residence

:  2012

Scope of Work

• Civil/Finishes (interior & exterior) – Turnkey Interiors: Demolition, Floor Construction, Concrete Block Works Acoustical Wall Panels, Acoustical Ceilings, Painting Works, Wooden Parquet Flooring, Installation of Doors & Windows.

• Mechanical and Electrical Works.

Price Water House Cooper

Project Description

Interior fit-out with a total area of 1087 m² consist of two (2) level offices with 544 m² at 23rd floor and 543 m² at 24th floor.

Designation

Location

Client

Year Completed

:  Main Contractor

:  23-24th Floor, Arraya Tower

:  Price Water House Cooper

:  2009

Price Water House Cooper

Project Description

Interior fit-out with a total area of 1087 m² consist of two (2) level offices with 544 m² at 23rd floor and 543 m² at 24th floor.

Designation

Location

Client

Year Completed

:  Main Contractor

:  23-24th Floor, Arraya Tower

:  Price Water House Cooper

:  2009

Scope of Work

• Turnkey Interiors: Concrete and Masonry, Metals, Glazing and Doors. Finishes such as Paint, Dry Wall Partitions, Acoustical Wall Panels, Glass Partitions, Foldable Walls, Demountable Partitions, Acoustical Ceilings, Ceramic Tiles and vinyl flooring – Bolon.

• Mechanical, Electrical and Plumbing Works

Al Massar Leasing & Investment Co.

Project Description

Renovation of Al Massar Leasing & Investment Co. main office.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Baitak Tower

:  Al Massar Leasing & Investment Co.

:  2008

Al Massar Leasing & Investment Co.

Project Description

Renovation of Al Massar Leasing & Investment Co. main office.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Baitak Tower

:  Al Massar Leasing & Investment Co.

:  2008

Scope of Work

• Civil/Architectural/Finishes – Turnkey Interiors: Gypsum partitions, Ceiling & Flooring Works, Installation of Wallpaper on Concrete Wall, Installation of Glass Doors and Windows.

• Electro-Mechanical Works

AL Tanmiya Co - Head Office

Project Description

Constructing office for AL-Tanmiya Holding Co.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Hamad Tower

:  Al Tanmiya Holding Co.

:  2008

AL Tanmiya Co - Head Office

Project Description

Constructing office for AL-Tanmiya Holding Co.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Hamad Tower

:  Al Tanmiya Holding Co.

:  2008

Scope of Work

• Civil / Finishes – Turnkey Interiors : Ceiling, Installation of Flooring Ceramic Tiles, Wall Cladding, Waterproofing, Painting Works, Supply and Installation of Furniture.

• Mechanical Works: Plumbing (Toilet & Kitchen), HVAC, Kitchen Hood System.

• Electrical Works: Wiring (Open, Concealed, Trunkey), DBs, Lighting.

CITY CENTER HYPERMARKET

Project Description

Rehabilitation of the whole plot, demolition of external ramps, internal partitions and all parts that serves the purpose of the new design, maintenance of the existing building and new construction for extension area. Project total area is 9145 m² consist of three (3) levels divided as basement level with 3966 m² shopping area, storages and service spaces, ground floor with 3054 m² for shopping area and first floor level with 2125 m² for fast food, kid’s, prayer room area, public toilets and terrace.

Designation

Location 1

Location 2

Client

Year Completed

:  Main Contractor

:  Al-Dajeej, Kuwait – 2012

:  Dasma, Kuwait – 2017

:  City Centre Commercial Co .

:  2008

CITY CENTER HYPERMARKET

Project Description

Rehabilitation of the whole plot, demolition of external ramps, internal partitions and all parts that serves the purpose of the new design, maintenance of the existing building and new construction for extension area. Project total area is 9145 m² consist of three (3) levels divided as basement level with 3966 m² shopping area, storages and service spaces, ground floor with 3054 m² for shopping area and first floor level with 2125 m² for fast food, kid’s, prayer room area, public toilets and terrace.

Designation

Location 1

Location 2

Client

Year Completed

:  Main Contractor

:  Al-Dajeej, Kuwait – 2012

:  Dasma, Kuwait – 2017

:  City Centre Commercial Co .

:  2008

Scope of Work

• Construction, completion, commissioning, handing–over and maintenance.

• Civil / Finishes (Interior / Exterior) Turnkey Interiors: Excavation, Concrete, Masonry, Metals, Carpentry Works, Painting, Metal Cladding, Landscape Works, Installation of Doors and Finishing Works.

• Mechanical Works: HVAC, Plumbing & Fire Fighting.

• Electrical Works: Wiring (Open, Concealed, Trunkey), MSB, DBs, Lighting, Telephone Data, Generator & Fire Fighting.

GEANT HYPERMARKET

Project Description

Construction of Geant Hypermarket

GEANT Egaila

GEANT Salmiya

GEANT Sulaibikhat

GEANT 360 Mall

:  2012

:  2010

:  2010

:  2009

GEANT HYPERMARKET

Project Description

Construction of Geant Hypermarket

GEANT Egaila

GEANT Salmiya

GEANT Sulaibikhat

GEANT 360 Mall

:  2012

:  2010

:  2010

:  2009

Scope of Work

• Construction, completion, commissioning, handing–over and maintenance.

• Civil / Finishes (Interior / Exterior) Turnkey Interiors: Excavation, Concrete, Masonry, Metals, Carpentry Works, Painting, Metal Cladding, Landscape Works, Installation of Doors and Finishing Works.

• Mechanical Works: HVAC, Plumbing & Fire Fighting.

• Electrical Works: Wiring (Open, Concealed, Trunkey), MSB, DBs, Lighting, Telephone Data, Generator & Fire Fighting.

CARREFOUR

Project Description

Construction of Carrefour Express in Awtad Complex at Jahra

Location

Client


Year Completed

:  Jahra, Kuwait

:  Carrefour Express, MAF

   Hypermarkets., UAE

:  2011

CARREFOUR

Project Description

Construction of Carrefour Express in Awtad Complex at Jahra

Location

Client


Year Completed

:  Jahra, Kuwait

:  Carrefour Express, MAF

   Hypermarkets., UAE

:  2011

ICONIC store– Avenues Phase II

Project Description

Construction of ICONIC store inside Avenues.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Avenues Mall

:  Land Mark Group

:  2013

ICONIC store– Avenues Phase II

Project Description

Construction of ICONIC store inside Avenues.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Avenues Mall

:  Land Mark Group

:  2013

Scope of Work

• Civil/Architectural/Finishes – Turnkey Interiors: Gypsum partitions, Ceiling & Flooring Works, Installation of Wallpaper on Concrete Wall, Installation of Glass Doors and Windows.

• Electro-Mechanical Works.

The English School - Auditorium

Project Description

Renovation of school auditorium.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Salmiya

:  English School

:  2011

The English School - Auditorium

Project Description

Renovation of school auditorium.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Salmiya

:  English School

:  2011

Scope of Work

• Civil/Finishes (interior & exterior) – Turnkey Interiors: Demolition, Floor Construction, Concrete Block Works Acoustical Wall Panels, Acoustical Ceilings, Painting Works, Wooden Parquet Flooring, Installation of Doors & Windows, Installation of L-shape staircase and services counters.

• Mechanical and Electrical Works

Arab Open University

Project Description

Redevelopment of Arab Open University Head Quarter and Kuwait Branch Buildings.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Al Ardiya

:  Arab Open University

:  2019

Arab Open University

Project Description

Redevelopment of Arab Open University Head Quarter and Kuwait Branch Buildings.

Designation

Location

Client

Year Completed

:  Main Contractor

:  Al Ardiya

:  Arab Open University

:  2019

Scope of Work

• External Sigma Works

• Renovation of two (2) Theaters which includes raising the floor levels, installation of new carpets, marble works and painting.

• Supply & Installation of RMD Cladding for both buildings

• Remodeling of all Toilets.

• Construction of New Classrooms and Computer Labs.

• Replacement of all classrooms and Labs flooring.

Taiba Hospital

Project Description

Renovation of Taiba Hospital (2nd Floor to 6th Floor) – Building 1, 2

Designation

Location

Client

Year Completed

:  Main Contractor

:  Sabah AL Salem Area

:  Taiba Hospital

:  2016

Taiba Hospital

Project Description

Renovation of Taiba Hospital (2nd Floor to 6th Floor) – Building 1, 2

Designation

Location

Client

Year Completed

:  Main Contractor

:  Sabah AL Salem Area

:  Taiba Hospital

:  2016

Scope of Work

• Civil / Finishes (Interior / Exterior Works for Buildings No. 1 & 2 )

• Turnkey Interiors : Masonry, Metals & Carpentry Works, Painting, Metal Cladding, Installation of Doors and Finishing Works

• Electro- Mechanical Works.

Parquet Flooring - Tennis Academy 360 Mall

Project Description

Supply & installation of Parquet flooring at Fitness Center & Tennis Academy

Year Comp

Location

Client

Year Completed

:  2020

:  360 Mall – Kuwait

:  Ayala International

:  Shaikh Jaber AL Abdullah AL Jaber AL Sabah International Tennis Complex

Parquet Flooring - Tennis Academy 360 Mall

Project Description

Supply & installation of Parquet flooring at Fitness Center & Tennis Academy

Year Comp

Location

Client

Year Completed

:  2020

:  360 Mall – Kuwait

:  Ayala International

:  Shaikh Jaber AL Abdullah AL Jaber AL Sabah International Tennis Complex

MILITARY CONSTRUCTION

Project Description

Construct a connecting taxiway to Runway 12L-30R off the west end of Lima ramp – Military Base

Constructing easements & maintenance pavement in Cargo City – Military Base

MILITARY CONSTRUCTION

Project Description

Construct a connecting taxiway to Runway 12L-30R off the west end of Lima ramp – Military Base

Constructing easements & maintenance pavement in Cargo City – Military Base

INFRASTRUCTURE PROJECTS

Project Description

Construction of Reinforcement Concrete Foundations for ISBL Storage Vessel – Mina Al Shuaiba

Installation of Storm Water Network – Sabah Al Ahmed Sea City Project –
Phase 4

INFRASTRUCTURE PROJECTS

Project Description

Construction of Reinforcement Concrete Foundations for ISBL Storage Vessel – Mina Al Shuaiba

Installation of Storm Water Network – Sabah Al Ahmed Sea City Project –
Phase 4

© 2021 Copyright – Primeone Group